To address increasing traffic through the valley, and in anticipation of eventual development of the Boeing Longacres property, Lind Avenue SW will be widened to 5 lanes where required.
This project would include new roadway surface, curbs, gutters, sidewalks, drainage, signals, lighting, signing, and channelization.
A potential project is a signal installation at the intersection at Lind Avenue SW and SW 34th Street. Additionally, improvements may result from future WSDOT I 405 plans (currently unfunded) which include an interchange at Lind Avenue SW.
The needs, priorities and schedules for improvements on Lind Avenue will be determined through arterial circulation studies, thus, schedules for design and construction are not yet established.
This project is significantly unfunded and the current total cost estimate is around $3.5 million.