The Houser Way Intersection & Pedestrian Improvements Project began in fall 2020 and ended in spring 2022 in coordination with the Wells Ave S and Williams Ave S Conversion Project. The project enhanced safety for pedestrians and bicyclists crossing at the intersections of Houser Way S at Wells Ave S and Williams Ave S. The project constructed new curb, gutter and sidewalk (including curb extensions), and ADA improvements on Houser Way at Williams Ave S and Wells Ave S and installed a new 12” water main in an existing casing on Williams Ave S under the BNSF railroad tracks.
We have the latest updates on other construction projects in downtown Renton online.
How has the project upgraded downtown Renton?
-
Installed new sidewalks and crossing improvements to increase pedestrian mobility and safety while enhancing the street environment.
-
New, permanent all-way stops on Houser Way S at Wells Ave S and Williams Ave S.
Stay Up-to-Date
-
Project Updates Register to receive project updates by email or text.
-
Downtown Construction Projects Hub There are several ongoing construction projects downtown. Check out the hub to see what construction projects are happening near you so you can plan ahead if you are traveling to downtown Renton.
-
Questions? Call 425-363-1007 or email [email protected].
What to Expect
The project paved both intersections on Houser Ave S at Wells Ave S and Williams Ave S.
We installed electrical utility improvements at the intersections of Houser Ave S at Wells Ave S and Williams Ave S.
We plan to pour the sidewalk on Houser Ave S at Wells Ave S and Williams Ave S next. There is an ongoing concrete strike, so this work is contingent on the concrete supply as well as weather dependent.
In the meantime, we installed temporary asphalt sidewalk for a better pedestrian experience. Please don’t hesitate to reach out if you have suggestions for how to improve the temporary pedestrian access.
-
Typical works hours: 7 a.m. to 5 p.m., Monday – Friday. We may work after 5 p.m. and on weekends to help minimize impacts.
-
Single-lane of through traffic: Our intent is to maintain at least one lane of traffic on Wells Ave S, Williams Ave S, and Houser Way S.
Noise, dust, and vibration
-
Pedestrian access: We plan to maintain access to businesses’ front doors during business hours with temporary asphalt and potentially pedestrian ramps.
-
Parking restrictions: There may be some on-street parking restrictions near work zones. Check out the free parking options.
Free parking downtown
-
We are trying to minimize parking impacts as much as possible.
-
The City Center Parking Garage on S 2nd St offers free parking for access to downtown businesses through June of this year and can also be used by residents during construction. The garage is accessible between 5 a.m. and 11 p.m., Sunday through Thursday, and from 5 a.m. to 1 a.m. on Friday and Saturday.
-
Overnight parking is allowed during our construction efforts, but please note that all garage doors are locked outside of these hours.
-
There are several public parking lots downtown that offer up to 2 hours of free parking and convenient access to downtown businesses. For more information about places to park downtown, please check out the City’s Downtown Parking Map.