Bronson Way Bridge - Seismic Retrofit and Painting
Bronson Way Bridge Open
- As of early afternoon on Wednesday, July 12, Bronson Way S between N Riverside Drive and Mill Avenue S is open to all travelers following successful completion of bridge maintenance work.
- The remaining work is minor and will not require a full bridge closure. However, temporary single-lane closures and/or sidewalk closures may be needed.
- The Cedar River Trail near Bronson Way S is now open to walkers and bikers.
Project Hotline: 425-224-2449
Project Email: bronsonbridgeconst@stephersonassociates.com
Before and After Photos - Phase II and III
Project Description
Bridge preservation, seismic retrofit and painting of the Bronson Way Bridge, a three span bridge over the Cedar River, located in downtown Renton. The main span (span 2) consists of two steel plate girders connected by steel deck beams supporting the bridge deck.
Contractor: Construction, Inc.
Construction Estimate: $2.5 million (rounded)
This Project in This Week in Renton (TWIR)
Completed Construction
Work Element (1) - Bridge Painting
Steel main span:
- Installation (and removal) of temporary work access and containment system
- Removal of existing paint system
- Sealing and/or repair of areas with pack rust
- Application of new protective paint system (zinc primer, intermediate, color finish)
Work Elements (2) - Seismic Retrofit & (3) Deck Maintenance
Seismic retrofit activities for steel main span included:
- Temporarily elevate using hydraulic jacks
- Remove existing rocker and fixed bearings
- Install new elastomeric bearing pads on new concrete bearing pedestals
Maintenance activities for bridge deck included:
- Remove existing asphalt overlay wearing course
- Repair underlying concrete deck (as needed)
- Remove existing steel slide plate expansion joints
- Repair existing concrete curbs
- Adjust bridge drain inlet grates
- Install new compression seal expansion joints
- Install new waterproofing membrane on concrete deck
- Install new asphalt overlay wearing course on concrete deck
Before and After Photos - Phase I
Bridge History
The Bronson Way Bridge was built in 1939 by the Washington State Department of Transportation (WSDOT). In January 2018, ownership of the bridge was transferred to the City of Renton from WSDOT with the execution of the Turnback Agreement TB 1-0254 for State Route (SR) 900 through downtown Renton. Prior to the ownership transfer, the steel members were repainted by WSDOT on a cycle of approximately every 20 years, the last time being 1999. In 1978, the existing concrete deck was repaired and a water proofing membrane and asphalt overlay (wearing course) were installed on top, to protect the concrete deck from tire wear and water intrusion. Since 1939, no seismic improvements have been performed on the bridge.
Additional Project Information
Email Updates
govDelivery Embed
Title VI
The City of Renton hereby gives public notice that it is the City’s policy to assure full compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987, and related statutes and regulations in all programs and activities. Title VI requires that no person shall, on the grounds of race, color, sex, or national origin be excluded from the participation in, be denied the benefits of, or be otherwise subjected to discrimination under any Federal Aid Highway program or other activity for which the City of Renton receives federal financial assistance.
Any person who believes they have been aggrieved by an unlawful discriminatory practice under Title VI has a right to file a formal complaint with the City of Renton. Any such complaint must be in writing and filed with the City of Renton, Human Resources Dept. within one hundred eighty (180) days of the alleged discriminatory occurrence. Title VI Discrimination Complaint Forms may be obtained from the City of Renton, Public Works Dept., Transportation Div. at no cost to the complainant by calling 425-430-7380 or by visiting the Title VI page.
Project Manager
Derek Akesson, PE
Public Works - Transportation Systems
1055 S Grady Way, 5th Floor
Renton, WA 98057