Lind Avenue SW (SW 16th Street to SW 43rd Street) – 2017-2022 TIP #34

Project Manager – Keith Woolley, 425-430-7318

Description – To address increasing traffic through the valley, and in anticipation of eventual development of the Boeing Longacres property, Lind Avenue SW will be widened to 5 lanes where required. 

This project would include new roadway surface, curbs, gutters, sidewalks, drainage, signals, lighting, signing, and channelization.

A potential project is a signal installation at the intersection at Lind Avenue SW and SW 34th Street.  Additionally, improvements may result from future WSDOT I 405 plans (currently unfunded) which include an interchange at Lind Avenue SW.

Schedule – The needs, priorities and schedules for improvements on Lind Avenue will be determined through arterial circulation studies, thus, schedules for design and construction are not yet established. 

Project budget – This project is significantly unfunded and the current total cost estimate is around $3.5 million.